This part is compatible with 262 vehicle(s)
Notes |
Make |
Model |
Year |
Variant |
Type |
Chassis |
Engine |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI quattro |
AWD C5 4B2 |
2496cc 110KW 150HP AFB;AKN |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI quattro |
AWD C5 4B2 |
2496cc 132KW 180HP AKE;BAU;BDH |
|
Audi |
A6 |
2005 |
Diesel Saloon |
1.9 TDI |
FWD -- 4B2,C5 |
1896cc 96KW 130HP AVF;AWX |
|
Audi |
A6 |
2005 |
Diesel Saloon |
1.9 TDI |
FWD C5 4B2 |
1896cc 85KW 115HP AJM |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI |
FWD C5 4B2 |
2496cc 110KW 150HP AFB;AKN |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI |
FWD C5 4B2 |
2496cc 114KW 155HP AYM |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI |
FWD C5 4B2 |
2496cc 120KW 163HP BCZ;BDG;BFC |
|
Audi |
A6 |
2005 |
Diesel Saloon |
2.5 TDI |
FWD C5 4B2 |
2496cc 132KW 180HP AKE;BAU;BDH |
|
Audi |
A6 |
2005 |
Petrol Saloon |
1.8 T quattro |
AWD -- 4B2,C5 |
1781cc 132KW 180HP AJL |
|
Audi |
A6 |
2005 |
Petrol Saloon |
2.8 quattro |
AWD -- 4B2,C5 |
2771cc 142KW 193HP ACK;ALG;AMX;APR;AQD |
|
Audi |
A6 |
2005 |
Petrol Saloon |
4.2 quattro |
AWD -- 4B2,C5 |
4172cc 220KW 299HP ARS;ART;ASG;AWN |
|
Audi |
A6 |
2005 |
Petrol Saloon |
1.8 T quattro |
AWD C5 4B2 |
1781cc 110KW 150HP AEB;ANB;APU;ARK;AWT |
|
Audi |
A6 |
2005 |
Petrol Saloon |
2.4 quattro |
AWD C5 4B2 |
2393cc 120KW 163HP AJG;APZ |
|
Audi |
A6 |
2005 |
Petrol Saloon |
2.4 quattro |
AWD C5 4B2 |
2393cc 121KW 165HP AGA;ALF;AML;APS;ARJ |
|
Audi |
A6 |
2005 |
Petrol Saloon |
2.4 quattro |
AWD C5 4B2 |
2393cc 125KW 170HP BDV |
|
Audi |
A6 |
2005 |
Petrol Saloon |
2.7 T quattro |
AWD C5 4B2 |
2671cc 184KW 250HP ARE;BES |
|
Audi |
A6 |
2005 |
Petrol Saloon |
3.7 quattro |
AWD C5 4B2 |
3697cc 191KW 260HP AQG |
|
Audi |
A6 |
2005 |
Petrol Saloon |
3.0 quattro |
AWD C5 4B2 |
2976cc 162KW 220HP ASN |
|
Audi |
A6 |
2005 |
Petrol Saloon |
RS6 quattro |
AWD C5 4B2 |
4172cc 331KW 450HP BCY |
|
Audi |
A6 |
2005 |
Petrol Saloon |
S6 quattro |
AWD C5 4B2 |
4172cc 250KW 340HP ANK;AQJ |
Thanks to our customer the reason why we were standing here today
We focus on the stamping forming bending welding part for almost 30 years.
Founded in 1992, Started exporting in 2008, which is now covered more than 10000 square meters and with 439 employee.
Brazing furnace,for mass production
Raw material incoming inspection :
Raw material incoming inspection :
1.Five element analyzer
Automatic five element analyzer carbon sulfur manganese silicon phosphorus chemical element spectrum analyzer
Any type of the element out of specification will Affecting mechanical properties
Raw material incoming inspection :
2.Mechanical Properties
Only tensile strength, yield strength and elongation of raw materials meet the requirements can move into mass productions.
Decoiler
We bought the raw material by coil from the steel company ,we decoiler the steel sheet by ourslef ,which will save the cost and lead time for mass productions.
Laser cutting for the steel sheet
When produce the sample or the small batch of the product we normally use the laser cutting insted of the stamping blanking.
Tooling mold Prepare
We simulated the workpiece by J-STAMPING software ,then we design the mold for metal sheet part ,not only it short the leadtime for development but also saving the cost for customer.
Mold Workshop Warehouse
We can design and manufacture molds according to customer requirements,2500 square meter special for stamping mold warehouse.
CNC machining center
We introduce 5pcs of CNC machine ,all of them with 5 Axis not only they can produce the mold and tooling but also they can carry out some part of machine job.
The capacity of the CNC machine was :25000*1800*1000mm
Stamping Workshop
Overview of the Stamping workshop with cover the
Stamping equipment from 100T to 800T.
Hydraulic Press cover from 50T to 3100T.
With the mold(die,tooling) produce by ourselves we can customize all kinds of metal shape according to customer drawing call out.
Metal sheet bending by machine without mold or tooling help by press or stamping machine
Bending Workshop
CNC bending machine with servo control precise control the tolerance according to customer requirement.
The capacity of bending diameter reach to Φ135mm.
Welding Workshop
Welding robot with Synchronous workstation introduce from Panasonic Japan ,we had 23pcs welding arm with 64 pcs working stations,sheild welding support by Continuous gas supply station.
Brazing Welding For Pipe
Pipe with brazing welding can get perfect out appearance also reduce leaking on welding area.
Spot Welding (Resistance welding)
The ABB resistance welding robot can improve the welding joint strength also Improve spot welding efficiency.Reduce defects of traditional spot welding.
Surface Treatment
The coating line improves the efficiency, reduces the pollution to the environment, and the wastewater discharge after industrial treatment reaches the national standard.
Salt and spry test
Each batch of the surface treatment should go though the test before packing and shipment
Inspection tooling calibration by CMM
The inspecion calibration was a key job to ensure the quality of working piece.
Dimension Inspection
The mold and inspect gauge also the PPAP part was inspect by the CMM and Handy scanning equipment.
ERP System In Our Company
All data support by ERP System, Cover From Raw Material Incoming To Shipment.
Customer Audit
* Evaluate the quality of customer service.
* Compare the quality with previously established goals.
* Identify gaps for improvement.
* Find ways to improve customer service.
* Gather all of the required data with Live Agent.
* Check activities.
Company Team
Team Working Together For Bright Future
ENJOY THE WORK, ENJOY THE LIFE.